I. Project Overview
Project Name: Phase III Expansion Project for Key Aviation Components, Semiconductor Equipment, and Automotive Parts Manufacturing
Location: No. 56 Yunhu Road, Jintan Economic Development Zone, Changzhou City, Jiangsu Province
Project Nature: Expansion
Project Scope: With an investment of RMB 250 million, the project will expand the existing facility at No. 56 Yunhu Road, Jintan Economic Development Zone, Changzhou City, Jiangsu Province. This includes constructing a 34,000-square-meter production workshop and a 27,000-square-meter R&D workshop. The expansion will involve acquiring advanced automated equipment, including 115 machining centers, 30 cleaning machines, 1 anodizing line, and 10 sets of molds. Upon completion, the project will achieve an annual production capacity of 1 million sets of critical aviation components, 100,000 sets of semiconductor equipment, and 1.5 million sets of automotive parts.
Existing Projects and Environmental Protection Status: Existing projects include the newly constructed Phase I Aviation and Automotive Parts Production Project and the expanded Phase II Aviation and Automotive Parts Production Project. Exhaust gases from existing projects meet emission standards after quality-based treatment; wastewater containing nitrogen, phosphorus, and heavy metals is treated for reuse without discharge. Other wastewater is treated at the on-site sewage treatment station to meet standards before being transferred to Jintan City's Second Sewage Treatment Plant. Noise emissions meet standards through measures such as foundation vibration reduction and soundproofing. All solid wastes are properly disposed of.
II. Name and Contact Information of the Construction Unit
Project Developer: Jiangsu Shunfeng Aluminum Co., Ltd.
Address: No. 56 Yunhu Road, Jintan Economic Development Zone, Changzhou City, Jiangsu Province
Contact Person: Engineer Xu
Phone: 13401587210
Email: 597577704@qq.com
III. Environmental Impact Assessment Report Preparing Unit
EIA Unit: Nanjing University Environmental Planning and Design Institute (Jiangsu) Co., Ltd.
IV. Online Link to Public Opinion Form
The Public Opinion Form for the Environmental Impact Assessment of the Construction Project is available via the attached link.
V. Methods and Channels for Submitting Public Opinion Forms
During the preparation of the draft Environmental Impact Report, the public may submit opinions related to the environmental impact assessment to the construction unit via letter, email, submission of the Public Participation Survey Form (see attachment), or other means. Those submitting opinions are requested to indicate the date of submission, their real name, and contact information to facilitate feedback as needed.
建设项目环境影响评价公众意见表.docx
COPYRIGHT 2025 Changzhou Ranto Metalwork Co., Ltd ALL RIGHTS RESERVED. 苏ICP备2022042488号-1
Powered by:zzw